Is the Queue You Can See the Problem You Need to Fix?

Writer: Riann Smith
Riann Smith
10 minutes ago
2 min read

Picture a publishing team with a queue that keeps growing. The dashboard shows it. A sponsor looks at it and asks, entirely reasonably, whether the team needs two more people.


It's a sensible question, and sometimes the answer's yes. More capacity can be exactly the right call, and I don't want systems thinking to become a polite way of refusing a staffing request that's perfectly fair. But the place where delay becomes visible and the place where it starts are often different, and a queue is a very good spot from which to look at the wrong thing.


What happens when you follow one item?


Pick one piece of work and walk it through. How was it requested, who prepared it, who reviewed it, who did the work, how was it validated and handed over, and how many times did it go backwards? Include the returns and exceptions, because the happy path is the one everybody can already draw.


Then separate doing from waiting. Note when somebody was actually working on it, what each wait was for, and whether it was ready to work on when it arrived. Imagine our publishing team's submissions turning up in irregular batches, often without assets, and needing two rounds of clarification before anyone can start. The team is busy, the queue is long, and a good part of what looks like their capacity problem started upstream before it reached them. Some of that waiting is avoidable rework and some is necessary validation, and you want to know which is which. I've written before about the small unfinished part that holds up a whole feature. Here, the question is where the hold-up began.


Is it one cause or several?


Probably several. Capacity shortage, batching, missing inputs, shifting priorities, skills gaps, system limits and perfectly good controls can all produce the same symptom, and they can all be true at once. A queue is evidence to investigate. It isn't proof that its owner is blameless, or that another team caused it. Drawing the dependencies shows you the relationships, and it doesn't tell you which one dominates.


And some waiting is deliberate and worth keeping. Safety checks, proper consultation and validation shouldn't disappear just because they make a diagram look slow.


Water flows over and around dark rocks in a close view of a stream.


What would you change first?


Something small and bounded. Improve readiness for one type of submission, stagger the batches, protect specialist time for the recurring task. Say what you expect to change, and what would show you were wrong. Then look at the whole journey, not only the queue you started with. Has usable work reached customers sooner? Has the effort simply moved to another team? Has quality or accessibility slipped?


A sample usually tells you more than a new reporting obligation. Take five or six recent items and note what triggered each, whether it was ready, what it waited for, why it went backwards, and when somebody received something they could use. A short sample and a conversation with the people doing the work can tell you more than another dashboard.


Before you add capacity, find out what the queue is telling you. It's usually telling the truth, just not always about itself.


 
 
 